Thursday, March 4, 2010

Harutyunyan Machine




RULES:

Please be sure to either complete procedure A or B (not both)

· If you are the first person start with Procedure A

· If you do not see a wooden piece with nails to the left of the project complete procedure A

· If you see a wood piece with nails on the left side of the project complete procedure B

Procedure A

1. Grab a piece of wood from the right hand side

2. Take between 4-10 nails.

3. Nail your chosen number of nails to the wood plane in a pattern that you chose.

4. Place your wood piece with the nails to the left of the “main project”

You are done.

Procedure B

1. Grab a piece of red string

2. Tie the string around some of the nails already present on the main project in front of you.

3. Grab the wooden piece with nails located to the left of the project and place it on top so that one of the edges is parallel with the one underneath

4. Bring the string to the top piece and tie it in a similar manner to the first one
















No comments:

Post a Comment